// community transparency

The proof the planning board asks for.

Communities want to know how much energy and water a data center uses, and what it gives back. Cathode generates that report from the telemetry it already watches. The operator decides what gets published and where.

Sample data. An illustrative site, not a real operator. Every number on this page is made up to show the format.

Community transparency report · Trailing twelve months, Oct–Sep

Sample Campus A, 24 MW

Generated by Cathode from BMS, EPMS and utility meter data. Published by the operator.

Energy, trailing 12 months
175 GWh
Water withdrawn, trailing 12 months
66.2M gal
Power usage effectiveness
1.24
Water usage effectiveness
0.38 L/kWh
Permanent local jobs
212
Peak construction jobs
640

Electricity used, by month (MWh)

Rises with summer cooling load; peaked in July at 15,900 MWh.

05k10k15k20kOctNovDecJanFebMarAprMayJunJulAugSep
Show as a table
MonthMWh
Oct13,900
Nov13,600
Dec14,100
Jan14,300
Feb13,200
Mar14,000
Apr14,400
May14,900
Jun15,500
Jul15,900
Aug15,800
Sep15,100

Water withdrawn, by month (million gallons)

Evaporative cooling drives the summer peak; winter months run near the baseline.

02.557.5106.4MOctNovDecJanFebMarAprMayJunJulAugSep
Show as a table
MonthMillion gallons
Oct4.4
Nov4.2
Dec4.3
Jan4.3
Feb4.2
Mar4.6
Apr5.2
May6.1
Jun7.1
Jul7.8
Aug7.6
Sep6.4

What the site gives back, trailing 12 months ($ millions)

Paid locally: wages to people who live in the county, taxes, and spending with local suppliers.

Local payroll$18.4MProperty tax$3.1MSales and use tax$1.2MLocal suppliers$6.7M

How this report is made

Cathode reads the data a site already produces: utility interval meters, BMS and EPMS points, and water meters. Energy and water come straight from metered data, not estimates. Economic figures come from the operator's own payroll, tax and procurement records. Nothing is published until the operator approves it.